Installation Instructions For Hydro Pneumatic Fender
Jan 28, 2026
1.The fender consists of upper and lower ends
1.1 The upper hanging chain serves two purposes: Used for hoisting during installation , and for hanging the mooring chain, connecting the fender to the dock.
1.2 The lower chain connects to the counterweight block.
2.Lifting equipment is required for installation.
3.Water-to-air ratio: 65% water, 35% air (approx.)
4.Installation Steps.
4.1Connect the water and air hoses;
4.2 Inflate the fender to 0.01 MPa;
4.3 Connect the fender to the counterweight block;
4.4 Use lifting equipment to lower the fender into the water;
4.5 Slowly release air to allow the fender to sink gradually;
4.6 Fill the fender with water until 65% capacity is reached;
4.7 Close the water valve, and continue inflating air to 0.05 MPa;
4.8 Install the mooring chain, connect the fender to the dock's fixed installation;
4.9 Remove the air/water hoses and lifting equipment;